Gransolar Texas Four LLC — Interconnection Queue Projects
Gransolar Texas Four LLC is associated with 3 tracked interconnection projects representing 456 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 4 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 266 MW |
| Battery | 1 | 190 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Harryoung PV and BESS | 67777_GRS4B | Battery | 190.0 MW | active | Cameron, Texas |
| Harryoung PV and BESS | 67777_GRS4P | Solar | 190.0 MW | active | Cameron, Texas |
| Eytcheson Solar | 66398_EYTCH | Solar | 76.4 MW | active | Navarro, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Gransolar Texas Four LLC.
Start tracking with interXdata