Greenalia Solar Power Ratcliff — Interconnection Queue Projects

Greenalia Solar Power Ratcliff is associated with 1 tracked interconnection projects representing 79 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

1Projects
1Active
0Operational
0Withdrawn
79 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar179 MW

Geographic footprint

StateProjects
Texas1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Ratcliff Solar Park67563_RAGSPSolar78.8 MWactiveFreestone, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Greenalia Solar Power Ratcliff.

Start tracking with interXdata