GridLiance — Interconnection Queue Projects
GridLiance is associated with 2 tracked interconnection projects representing 80 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 80 MW |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Tie 69 kV Substation | GEN-2023-121 | Solar | 50.0 MW | withdrawn | Cowley, Kansas |
| GridLiance's Cougar 69 kV Substation | ASGI-2024-002 | Solar | 30.0 MW | operational | Boise City, Oklahoma |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through GridLiance.
Start tracking with interXdata