GridUnity — Interconnection Queue Projects
GridUnity is associated with 2 tracked interconnection projects representing 245 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
0Active
1Operational
1Withdrawn
245 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 1 | 200 MW |
| Gas | 1 | 45 MW |
Geographic footprint
| State | Projects |
|---|---|
| Minnesota | 1 |
| Mississippi | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Andes Substation | J4154 | Battery | 200.0 MW | operational | Madison, Mississippi |
| Westside | J3445 | Gas | 45.0 MW | withdrawn | Olmsted, Minnesota |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.