GridUnity — Interconnection Queue Projects

GridUnity is associated with 2 tracked interconnection projects representing 245 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
1Operational
1Withdrawn
245 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery1200 MW
Gas145 MW

Geographic footprint

StateProjects
Minnesota1
Mississippi1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Andes SubstationJ4154Battery200.0 MWoperationalMadison, Mississippi
WestsideJ3445Gas45.0 MWwithdrawnOlmsted, Minnesota

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through GridUnity.

Start tracking with interXdata