GRS BESS Texas Eight LLC — Interconnection Queue Projects

GRS BESS Texas Eight LLC is associated with 2 tracked interconnection projects representing 232 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

2Projects
2Active
0Operational
0Withdrawn
232 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery1116 MW
Solar1116 MW

Geographic footprint

StateProjects
Texas2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Marcos PV and BESS68080_GRS8BBattery115.9 MWactiveVictoria, Texas
Marcos PV and BESS68080_GRS8PSolar115.9 MWactiveVictoria, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through GRS BESS Texas Eight LLC.

Start tracking with interXdata