Intersect USA, LLC — Interconnection Queue Projects
Intersect USA, LLC is associated with 30 tracked interconnection projects representing 9,241 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
30Projects
18Active
12Operational
0Withdrawn
9,241 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 15 | 5,098 MW |
| Battery | 13 | 2,972 MW |
| Wind | 2 | 1,170 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 16 |
| California | 14 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| IP Roman Wind | 68202_ROMW | Wind | 670.5 MW | active | Deaf Smith, Texas |
| IP Meitner Wind | 68204_MEITW | Wind | 500.0 MW | active | Roberts, Texas |
| IP Roman Solar | 68201_ROMS | Solar | 500.0 MW | active | Deaf Smith, Texas |
| IP Meitner Solar | 68203_MEITS | Solar | 500.0 MW | active | Gray, Texas |
| Quantum BESS | 68759_IPQ1B | Battery | 422.4 MW | active | Haskell, Texas |
| Quantum II BESS | 68761_IPQ2B | Battery | 422.4 MW | active | Haskell, Texas |
| Quantum II Solar | 68762_IPQ2S | Solar | 362.8 MW | active | Haskell, Texas |
| Quantum Solar | 68760_IPQ1S | Solar | 362.8 MW | active | Haskell, Texas |
| Darden II Solar | 69662_IPD2S | Solar | 342.7 MW | active | Fresno, California |
| Darden III Solar | 69663_IPD3S | Solar | 342.7 MW | active | Fresno, California |
| Darden IV Solar | 69664_IPD4S | Solar | 342.7 MW | active | Fresno, California |
| Darden I Solar | 69661_IPD1S | Solar | 342.7 MW | active | Fresno, California |
| Lumina Solar Project | 65645_LUMIN | Solar | 326.6 MW | operational | Scurry, Texas |
| Lumina II Solar Project | 65644_LUMII | Solar | 326.6 MW | operational | Scurry, Texas |
| IP Radian, LLC | 64859_IPRAD | Solar | 320.0 MW | operational | Brown, Texas |
| Briggs Solar, LLC | 66691_BRIGG | Solar | 305.0 MW | active | Haskell, Texas |
| Darden IV Solar | 69664_IPD4B | Battery | 303.7 MW | active | Fresno, California |
| Darden I Solar | 69661_IPD1B | Battery | 303.7 MW | active | Fresno, California |
| Darden II Solar | 69662_IPD2B | Battery | 303.7 MW | active | Fresno, California |
| Darden III Solar | 69663_IPD3B | Battery | 303.7 MW | active | Fresno, California |
| Oberon Solar Project | 65734_OBIPV | Solar | 250.0 MW | operational | Riverside, California |
| Oberon II Solar Project | 65735_OBIIP | Solar | 250.0 MW | operational | Riverside, California |
| Blythe Mesa Solar II | 65053_IPBMS | Solar | 223.6 MW | operational | Riverside, California |
| Lumina Solar Project | 65645_LU1BA | Battery | 160.0 MW | operational | Scurry, Texas |
| Lumina II Solar Project | 65644_LU2BA | Battery | 160.0 MW | operational | Scurry, Texas |
| IP Radian, LLC | 64859_RADBA | Battery | 160.0 MW | operational | Brown, Texas |
| Oberon II Solar Project | 65735_OBIIB | Battery | 125.0 MW | operational | Riverside, California |
| Oberon Solar Project | 65734_OBIBS | Battery | 125.0 MW | operational | Riverside, California |
| Blythe Mesa Solar II | 65053_BMSES | Battery | 112.0 MW | operational | Riverside, California |
| Briggs Solar, LLC | 66691_BRUGG | Battery | 70.5 MW | active | Haskell, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Intersect USA, LLC.
Start tracking with interXdata