Kissimmee Utility Authority — Interconnection Queue Projects

Kissimmee Utility Authority is associated with 7 tracked interconnection projects representing 706 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

7Projects
0Active
7Operational
0Withdrawn
706 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas7706 MW

Geographic footprint

StateProjects
Florida7

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Cane Island7238_4Gas180.0 MWoperationalOsceola, Florida
Cane Island7238_3Gas152.0 MWoperationalOsceola, Florida
Cane Island7238_4AGas143.5 MWoperationalOsceola, Florida
Cane Island7238_3AGas82.5 MWoperationalOsceola, Florida
Cane Island7238_2Gas76.0 MWoperationalOsceola, Florida
Cane Island7238_2AGas40.0 MWoperationalOsceola, Florida
Cane Island7238_1Gas32.0 MWoperationalOsceola, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.