Lee County Board-Commissioners — Interconnection Queue Projects

Lee County Board-Commissioners is associated with 2 tracked interconnection projects representing 59 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
2Operational
0Withdrawn
59 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other259 MW

Geographic footprint

StateProjects
Florida2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Lee County Solid Waste Energy52010_GEN1Other39.0 MWoperationalLee, Florida
Lee County Solid Waste Energy52010_GEN2Other20.0 MWoperationalLee, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Lee County Board-Commissioners.