Monterey Regional Waste Mgmt — Interconnection Queue Projects
Monterey Regional Waste Mgmt is associated with 8 tracked interconnection projects representing 12 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
8Projects
4Active
4Operational
0Withdrawn
12 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 8 | 12 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 8 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Marina Landfill Gas | 10748_FUTR2 | Gas | 1.6 MW | active | Monterey, California |
| Marina Landfill Gas | 10748_U1C06 | Gas | 1.6 MW | operational | Monterey, California |
| Marina Landfill Gas | 10748_FUTR1 | Gas | 1.6 MW | active | Monterey, California |
| Marina Landfill Gas | 10748_FUTR4 | Gas | 1.6 MW | active | Monterey, California |
| Marina Landfill Gas | 10748_FUTR3 | Gas | 1.6 MW | active | Monterey, California |
| Marina Landfill Gas | 10748_U4J16 | Gas | 1.4 MW | operational | Monterey, California |
| Marina Landfill Gas | 10748_U2J18 | Gas | 1.1 MW | operational | Monterey, California |
| Marina Landfill Gas | 10748_U3J17 | Gas | 1.0 MW | operational | Monterey, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Monterey Regional Waste Mgmt.
Start tracking with interXdata