NC State University, Energy Systems — Interconnection Queue Projects
NC State University, Energy Systems is associated with 4 tracked interconnection projects representing 18 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
4Projects
0Active
4Operational
0Withdrawn
18 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 4 | 18 MW |
Geographic footprint
| State | Projects |
|---|---|
| North Carolina | 4 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| NCSU Cates Cogeneration Plant | 61676_CTG1 | Gas | 5.6 MW | operational | Wake, North Carolina |
| NCSU Cates Cogeneration Plant | 61676_CTG2 | Gas | 5.6 MW | operational | Wake, North Carolina |
| NCSU CCUP Cogeneration Plant | 61675_CTG1 | Gas | 5.6 MW | operational | Wake, North Carolina |
| NCSU CCUP Cogeneration Plant | 61675_STG | Gas | 1.0 MW | operational | Wake, North Carolina |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through NC State University, Energy Systems.