New Smyrna Beach Utilities Commission — Interconnection Queue Projects

New Smyrna Beach Utilities Commission is associated with 2 tracked interconnection projects representing 48 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
1Operational
0Withdrawn
48 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other248 MW

Geographic footprint

StateProjects
Florida2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Field Street7954_2Other24.0 MWoperationalVolusia, Florida
Field Street7954_1Other24.0 MWsuspendedVolusia, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through New Smyrna Beach Utilities Commission.

Start tracking with interXdata