NSTAR Electric Company — Interconnection Queue Projects
NSTAR Electric Company is associated with 17 tracked interconnection projects representing 45 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 17 | 45 MW |
Geographic footprint
| State | Projects |
|---|---|
| Massachusetts | 17 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| East Longmeadow Solar PV | 62059_LG400 | Solar | 5.0 MW | operational | Hampden, Massachusetts |
| Southwick Solar PV | 62082_REC34 | Solar | 5.0 MW | operational | Hampden, Massachusetts |
| Montague Site 36-Grosolar | 62092_REC34 | Solar | 4.1 MW | operational | Franklin, Massachusetts |
| Springfield Solar PV | 62072_LG395 | Solar | 4.0 MW | operational | Hampden, Massachusetts |
| Hatfield Solar PV | 62091_LG395 | Solar | 3.6 MW | operational | Hampshire, Massachusetts |
| Hampden Solar PV | 62073_LG390 | Solar | 3.5 MW | operational | Hampden, Massachusetts |
| Wareham Solar PV | 62055_LG395 | Solar | 3.3 MW | operational | Plymouth, Massachusetts |
| Hinsdale Solar PV | 62064_LG400 | Solar | 2.0 MW | operational | Berkshire, Massachusetts |
| Southampton Solar PV | 62066_LG400 | Solar | 2.0 MW | operational | Hampshire, Massachusetts |
| Greenfield Solar PV | 62063_LG400 | Solar | 2.0 MW | operational | Franklin, Massachusetts |
| Savoy Solar PV | 62065_LG400 | Solar | 2.0 MW | operational | Hampshire, Massachusetts |
| Ludlow Site 72 - Conti | 62097_LG390 | Solar | 1.9 MW | operational | Hampden, Massachusetts |
| Lee Site 31 Solar | 62265_LG370 | Solar | 1.9 MW | operational | Berkshire, Massachusetts |
| East Springfield Solar PV | 62093_REC34 | Solar | 1.4 MW | operational | Hampden, Massachusetts |
| Pittsfield 44 - M&W PV | 62264_LG400 | Solar | 1.2 MW | operational | Berkshire, Massachusetts |
| Sunderland Solar PV | 62090_REC34 | Solar | 1.1 MW | operational | Franklin, Massachusetts |
| Plymouth Solar | 62266_LG400 | Solar | 1.1 MW | operational | Plymouth, Massachusetts |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through NSTAR Electric Company.