PCA-Valdosta Mill — Interconnection Queue Projects
PCA-Valdosta Mill is associated with 3 tracked interconnection projects representing 70 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
0Active
3Operational
0Withdrawn
70 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 3 | 70 MW |
Geographic footprint
| State | Projects |
|---|---|
| Georgia | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PCA-Valdosta Mill | 60084_TG3 | Other | 52.3 MW | operational | Lowndes, Georgia |
| PCA-Valdosta Mill | 60084_TG1 | Other | 10.1 MW | operational | Lowndes, Georgia |
| PCA-Valdosta Mill | 60084_TG2 | Other | 7.5 MW | operational | Lowndes, Georgia |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through PCA-Valdosta Mill.
Start tracking with interXdata