PCA-Valdosta Mill — Interconnection Queue Projects

PCA-Valdosta Mill is associated with 3 tracked interconnection projects representing 70 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
3Operational
0Withdrawn
70 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other370 MW

Geographic footprint

StateProjects
Georgia3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
PCA-Valdosta Mill60084_TG3Other52.3 MWoperationalLowndes, Georgia
PCA-Valdosta Mill60084_TG1Other10.1 MWoperationalLowndes, Georgia
PCA-Valdosta Mill60084_TG2Other7.5 MWoperationalLowndes, Georgia

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through PCA-Valdosta Mill.

Start tracking with interXdata