Sierra Nevada Brewing Co — Interconnection Queue Projects

Sierra Nevada Brewing Co is associated with 3 tracked interconnection projects representing 4 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
3Operational
0Withdrawn
4 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas12 MW
Solar12 MW
Battery10 MW

Geographic footprint

StateProjects
California3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sierra Nevada Brewing Co Hybrid58585_COGNGas2.0 MWoperationalButte, California
Sierra Nevada Brewing Co Hybrid58585_SOLRSolar1.7 MWoperationalButte, California
Sierra Nevada Brewing Co Hybrid58585_BESSBattery0.5 MWoperationalButte, California

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Sierra Nevada Brewing Co.

Start tracking with interXdata