Solid Waste Authority of Palm Beach Co — Interconnection Queue Projects

Solid Waste Authority of Palm Beach Co is associated with 2 tracked interconnection projects representing 158 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
2Operational
0Withdrawn
158 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other2158 MW

Geographic footprint

StateProjects
Florida2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Palm Beach Renewable Energy Facility 257898_GEN2Other96.0 MWoperationalPalm Beach, Florida
Palm Beach Renewable Energy Facility 150071_GEN1Other62.3 MWoperationalPalm Beach, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Solid Waste Authority of Palm Beach Co.

Start tracking with interXdata