Solid Waste Authority of Palm Beach Co — Interconnection Queue Projects
Solid Waste Authority of Palm Beach Co is associated with 2 tracked interconnection projects representing 158 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
0Active
2Operational
0Withdrawn
158 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 158 MW |
Geographic footprint
| State | Projects |
|---|---|
| Florida | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Palm Beach Renewable Energy Facility 2 | 57898_GEN2 | Other | 96.0 MW | operational | Palm Beach, Florida |
| Palm Beach Renewable Energy Facility 1 | 50071_GEN1 | Other | 62.3 MW | operational | Palm Beach, Florida |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Solid Waste Authority of Palm Beach Co.
Start tracking with interXdata