Utility Board of Key West City (FL) — Interconnection Queue Projects
Utility Board of Key West City (FL) is associated with 7 tracked interconnection projects representing 126 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 7 | 126 MW |
Geographic footprint
| State | Projects |
|---|---|
| Florida | 7 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Stock Island | 6584_GT4 | Other | 42.0 MW | operational | Monroe, Florida |
| Stock Island | 6584_GT1 | Other | 23.4 MW | operational | Monroe, Florida |
| Stock Island | 6584_GT2 | Other | 19.7 MW | operational | Monroe, Florida |
| Stock Island | 6584_GT3 | Other | 19.7 MW | operational | Monroe, Florida |
| Stock Island | 6584_MSD1 | Other | 9.6 MW | operational | Monroe, Florida |
| Stock Island | 6584_MSD2 | Other | 9.6 MW | operational | Monroe, Florida |
| Stock Island | 6584_EP2 | Other | 2.5 MW | operational | Monroe, Florida |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Utility Board of Key West City (FL).
Start tracking with interXdata