Weber Basin Water Conserv Dist — Interconnection Queue Projects
Weber Basin Water Conserv Dist is associated with 6 tracked interconnection projects representing 8 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
6Projects
0Active
6Operational
0Withdrawn
8 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 6 | 8 MW |
Geographic footprint
| State | Projects |
|---|---|
| Utah | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Gateway | 3697_2 | Other | 2.0 MW | operational | Morgan, Utah |
| Gateway | 3697_1 | Other | 2.0 MW | operational | Morgan, Utah |
| Wanship | 3698_1 | Other | 1.9 MW | operational | Summit, Utah |
| Causey | 7548_1 | Other | 1.5 MW | operational | Weber, Utah |
| Causey | 7548_2 | Other | 0.6 MW | operational | Weber, Utah |
| Causey | 7548_MINI | Other | 0.1 MW | operational | Weber, Utah |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Weber Basin Water Conserv Dist.
Start tracking with interXdata