Buffalo Gap Wind Farm 2, LLC — Interconnection Portfolio
Buffalo Gap Wind Farm 2, LLC is associated with 3 tracked interconnection projects representing 520 MW of requested capacity.
Entity resolution: this developer rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 3 | 520 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Buffalo Gap 2 Wind Repower | 26INR0625 | Other | 231.5 MW | operational | Nolan, Texas |
| Buffalo Gap 3 Wind Repower | 26INR0626 | Other | 168.4 MW | operational | Taylor, Texas |
| Buffalo Gap 1 Wind Repower | 26INR0622 | Other | 120.2 MW | operational | Nolan, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Buffalo Gap Wind Farm 2, LLC's portfolio across all markets.
Start tracking with interXdata