First Solar — Interconnection Portfolio
First Solar is associated with 10 tracked interconnection projects representing 745 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
10Projects
0Active
2Operational
7Withdrawn
745 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 10 | 745 MW |
Portfolio by market
| Market | Projects |
|---|---|
| ERCOT | 10 |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Morada Del Sol Solar | 16INR0097 | Solar | 245.0 MW | suspended | Upton, Texas |
| Barilla Solar 3 | 15INR0072 | Solar | 140.0 MW | withdrawn | — |
| East Pecos Solar | 16INR0073 | Solar | 120.0 MW | operational | — |
| First Solar - Uvalde Solar | 12INR0063 | Solar | 90.0 MW | withdrawn | — |
| Uvalde Solar | 14INR0050 | Solar | 40.0 MW | withdrawn | — |
| Marfa 1 Solar | 15INR0043 | Solar | 30.0 MW | withdrawn | — |
| Alpine 1 Solar | 14INR0026 | Solar | 30.0 MW | withdrawn | — |
| Barilla Solar | 12INR0059 | Solar | 22.0 MW | operational | — |
| Barilla Solar 2 | 12INR0059c | Solar | 21.0 MW | withdrawn | — |
| HOVEY (Barilla Solar 1B) | 12INR0059b | Solar | 7.4 MW | withdrawn | Pecos, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor First Solar's portfolio across all markets.
Start tracking with interXdata