JC Central Bluff, LLC — Interconnection Portfolio

JC Central Bluff, LLC is associated with 3 tracked interconnection projects representing 615 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
3Operational
0Withdrawn
615 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other2414 MW
Solar1201 MW

Geographic footprint

StateProjects
Texas3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Forts Trail BESS24INR0341Other208.8 MWoperationalTaylor, Texas
Forts Trail BESS 224INR0488Other205.5 MWoperationalTaylor, Texas
Forts Trail Solar24INR0308Solar200.8 MWoperationalTaylor, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor JC Central Bluff, LLC's portfolio across all markets.

Start tracking with interXdata