Forts Trail BESS 2 (24INR0488)

Forts Trail BESS 2 is a 205.5 MW other interconnection project in Taylor, Texas with a current status of operational. It is proposed to connect at 11406 Central Bluff Switch 345 kV.

205.5 MWCapacity
OperationalStatus
TaylorMarket
OtherTechnology

Project facts

Canonical nameForts Trail BESS 2
Queue ID24INR0488
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketTaylor
TechnologyOther
Capacity205.5 MW
StateTexas
CountyTaylor
Point of interconnection11406 Central Bluff Switch 345 kV
Requested (queue) date2023-02-20
Proposed in-service date
Operational date2029-03-02
Withdrawn date
DeveloperJC Central Bluff, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata