PREMIER ENGINEERING USA CORP. — Interconnection Portfolio
PREMIER ENGINEERING USA CORP. is associated with 2 tracked interconnection projects representing 110 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
0Active
0Operational
2Withdrawn
110 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 110 MW |
Portfolio by market
| Market | Projects |
|---|---|
| ERCOT | 2 |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PV New Glory | 23INR0377 | Solar | 72.5 MW | withdrawn | Stonewall, Texas |
| Cabeza de Vaca | 24INR0074 | Solar | 37.8 MW | withdrawn | Lamar, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor PREMIER ENGINEERING USA CORP.'s portfolio across all markets.
Start tracking with interXdata