SMT Elm Mott BESS — Interconnection Portfolio

SMT Elm Mott BESS is associated with 1 tracked interconnection projects representing 255 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

1Projects
0Active
1Operational
0Withdrawn
255 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other1255 MW

Geographic footprint

StateProjects
Texas1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
PowerVault BESS26INR0422Other254.8 MWoperationalMcLennan, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor SMT Elm Mott BESS's portfolio across all markets.

Start tracking with interXdata