1000 MW HVDC (import only) (640)

1000 MW HVDC (import only) is a 1,000.0 MW generation interconnection project in Plymouth, Massachusetts with a current status of withdrawn. It is proposed to connect at Northern Interconnection: Coleson Cove 345kV Substation, New Brunswick Southern Interconnection: 345kV lines from Pilgrim Substation, Plymouth, Massachusetts.

1,000.0 MWCapacity
WithdrawnStatus
SEMAMarket
GenerationTechnology

Project facts

Canonical name1000 MW HVDC (import only)
Queue ID640
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGeneration
Capacity1,000.0 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionNorthern Interconnection: Coleson Cove 345kV Substation, New Brunswick Southern Interconnection: 345kV lines from Pilgrim Substation, Plymouth, Massachusetts
Requested (queue) date2017-04-21
Proposed in-service date2022-12-31
Operational date
Withdrawn date2020-11-30
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata