225 MW at Usk Substation (L0644)

225 MW at Usk Substation is a 225.0 MW other interconnection project in Pend Oreille, Washington with a current status of active. It is proposed to connect at Usk Substation.

225.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical name225 MW at Usk Substation
Queue IDL0644
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity225.0 MW
StateWashington
CountyPend Oreille
Point of interconnectionUsk Substation
Requested (queue) date2025-02-12
Proposed in-service date2028-02-18
Operational date
Withdrawn date
DeveloperPend Oreille County PUD No. 1
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata