Pend Oreille County PUD No. 1 — Interconnection Portfolio
Pend Oreille County PUD No. 1 is associated with 7 tracked interconnection projects representing 1,700 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
7Projects
1Active
1Operational
5Withdrawn
1,700 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 7 | 1,700 MW |
Geographic footprint
| State | Projects |
|---|---|
| Washington | 7 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Ponderay Renewable Fiber and Blockchain Center Expansion | L0511 | Other | 600.0 MW | withdrawn | Pend Oreille, Washington |
| Ponderary Renewable Fiber and Blockchain Project | L0494 | Other | 300.0 MW | operational | Pend Oreille, Washington |
| 225 MW at Usk Substation | L0644 | Other | 225.0 MW | active | Pend Oreille, Washington |
| HiTest 2-Furnace Plant | L0429 | Other | 210.0 MW | withdrawn | Pend Oreille, Washington |
| Mixed Use Load | L0537 | Other | 170.0 MW | withdrawn | Spokane, Washington |
| HiTest 2-Furnace Plant | L0428 | Other | 105.0 MW | withdrawn | Pend Oreille, Washington |
| Arc Furnace Load | L0404 | Other | 90.0 MW | withdrawn | Pend Oreille, Washington |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Pend Oreille County PUD No. 1's portfolio across all markets.
Start tracking with interXdata