230kV Lamb County Interchange (GEN-2020-017)

230kV Lamb County Interchange is a 74.9 MW solar interconnection project in Lamb County, Texas with a current status of withdrawn. It is proposed to connect at 230kV Lamb County Interchange.

74.9 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical name230kV Lamb County Interchange
Queue IDGEN-2020-017
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity74.9 MW
StateTexas
CountyLamb County
Point of interconnection230kV Lamb County Interchange
Requested (queue) date2020-04-24
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-04-04
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata