Lamb County County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Lamb County, Texas, representing 1,211 MW of requested capacity.
6Total projects
1Active
0Operational
5Withdrawn
1,211 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 776 MW |
| Wind | 2 | 435 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Tolk 230 kV substation | GEN-2017-080 | Solar | 525.0 MW | withdrawn | Lamb County, Texas |
| GEN-2008-072 | GEN-2008-072 | Wind | 300.0 MW | withdrawn | Lamb County, Texas |
| Plant X 115 kV Substation | GEN-2023-GR5 | Solar | 150.0 MW | active | Lamb County, Texas |
| GEN-2008-085 | GEN-2008-085 | Wind | 135.0 MW | withdrawn | Lamb County, Texas |
| 230kV Lamb County Interchange | GEN-2020-017 | Solar | 74.9 MW | withdrawn | Lamb County, Texas |
| Lamton 115kV | GEN-2017-091 | Solar | 26.3 MW | withdrawn | Lamb County, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lamb County County.