345 kV AC line (625)
345 kV AC line is a 1,600.0 MW generation interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at 345 kV Brayton point substation.
1,600.0 MWCapacity
WithdrawnStatus
RIMarket
GenerationTechnology
Project facts
| Canonical name | 345 kV AC line |
|---|---|
| Queue ID | 625 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Generation |
| Capacity | 1,600.0 MW |
| State | Massachusetts |
| County | Bristol |
| Point of interconnection | 345 kV Brayton point substation |
| Requested (queue) date | 2016-11-10 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | 2019-04-11 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata