Bristol County, Massachusetts — Interconnection Projects
The interXdata warehouse tracks 152 interconnection projects in Bristol, Massachusetts, representing 9,072 MW of requested capacity.
152Total projects
7Active
89Operational
55Withdrawn
9,072 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 38 | 4,623 MW |
| Other | 17 | 2,846 MW |
| Gas | 14 | 1,257 MW |
| Solar | 65 | 170 MW |
| Solar+Battery | 16 | 170 MW |
| Wind | 2 | 5 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 345 kV AC line | 625 | — | 1,600.0 MW | withdrawn | Bristol, Massachusetts |
| Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point | 837 | — | 1,200.0 MW | active | Bristol, Massachusetts |
| Battery Storage | 1426 | Battery | 528.8 MW | withdrawn | Bristol, Massachusetts |
| Combined Cycle | 211 | Gas | 496.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1460 | Battery | 350.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1340 | Battery | 292.5 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1367 | Battery | 271.4 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1339 | Battery | 257.1 MW | withdrawn | Bristol, Massachusetts |
| Energy Storage | 876 | Battery | 246.0 MW | withdrawn | Bristol, Massachusetts |
| Combined Cycle | 216 | Gas | 244.0 MW | withdrawn | Bristol, Massachusetts |
| Storage | 1198 | Battery | 241.8 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1430 | Battery | 237.5 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1335 | Battery | 205.8 MW | withdrawn | Bristol, Massachusetts |
| Dighton Power Plant | 55026_UNT1 | Gas | 200.0 MW | operational | Bristol, Massachusetts |
| Battery Storage | 1421 | Battery | 175.7 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1412 | Battery | 168.0 MW | active | Bristol, Massachusetts |
| Salt Cod BESS | 69722_BESS1 | Battery | 168.0 MW | active | Bristol, Massachusetts |
| Battery Storage | 1248 | Battery | 154.7 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1442 | Battery | 151.6 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1522 | Battery | 150.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1197 | Battery | 150.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1558 | Battery | 141.5 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1560 | Battery | 133.8 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1341 | Battery | 117.3 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1419 | Battery | 108.7 MW | withdrawn | Bristol, Massachusetts |
| Energy Storage | 752 | Battery | 102.8 MW | withdrawn | Bristol, Massachusetts |
| Energy Storage | 690 | Battery | 100.0 MW | withdrawn | Bristol, Massachusetts |
| Cleary Flood Hybrid | 1682_CA9 | Gas | 95.0 MW | operational | Bristol, Massachusetts |
| Battery Storage | 1565 | Battery | 81.0 MW | withdrawn | Bristol, Massachusetts |
| Combined Cycle GT | 608 | Gas | 68.0 MW | withdrawn | Bristol, Massachusetts |
| Dartmouth Power Associates LP | 52026_GEN1 | Gas | 41.9 MW | operational | Bristol, Massachusetts |
| Dartmouth Power Associates LP | 52026_GEN2 | Gas | 32.2 MW | operational | Bristol, Massachusetts |
| Brayton Point 3 Uprate( see 243) | 231 | Other | 30.0 MW | operational | Bristol, Massachusetts |
| Eversource Group @ Industrial Park 636 | 1001 | Solar+Battery | 29.1 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group @ Fisher Rd Substation 657 | 999 | Solar+Battery | 27.9 MW | withdrawn | Bristol, Massachusetts |
| Dartmouth Power Expansion | 195 | Gas | 24.0 MW | operational | Bristol, Massachusetts |
| Dartmouth Power Associates LP | 52026_GEN3 | Gas | 23.3 MW | operational | Bristol, Massachusetts |
| Cleary Flood Hybrid | 1682_9A | Gas | 23.0 MW | operational | Bristol, Massachusetts |
| Battery Storage | 1235 | Battery | 20.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1234 | Battery | 20.0 MW | withdrawn | Bristol, Massachusetts |
| Battery Storage | 1233 | Battery | 20.0 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group @ Wing Lane 624 | 1009 | Solar+Battery | 19.0 MW | withdrawn | Bristol, Massachusetts |
| Group @ Industrial Park 636 - EMA ASO | 1281 | Solar+Battery | 16.5 MW | withdrawn | Bristol, Massachusetts |
| Group @ Wing Lane 624 - EMA ASO | 1290 | Solar+Battery | 15.0 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group @ Bell Rock #661 | 1032 | Solar+Battery | 12.0 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group Study @ Industrial Park | 976 | Solar+Battery | 11.3 MW | withdrawn | Bristol, Massachusetts |
| NG DG @ Sykes Road | 1477 | Battery | 10.0 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group @ Cross Rd 651 | 996 | Solar+Battery | 9.5 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group @ Arsene St 654 | 992 | Solar+Battery | 7.0 MW | withdrawn | Bristol, Massachusetts |
| Dartmouth | 58682_PV1 | Solar | 6.3 MW | operational | Bristol, Massachusetts |
| Increase to Steam Turbine Capacity Uprate (See QP | 243 | Other | 6.0 MW | operational | Bristol, Massachusetts |
| Solar | 363 | Solar | 6.0 MW | withdrawn | Bristol, Massachusetts |
| Eversource Group Study @ Wing Lane | 978 | Solar | 5.1 MW | withdrawn | Bristol, Massachusetts |
| Borrego - Highland Ave | 67279_6572 | Solar | 5.0 MW | active | Bristol, Massachusetts |
| Brookwood Drive Community Solar | 64727_BRKWD | Solar | 5.0 MW | operational | Bristol, Massachusetts |
| Westport Stone & Sand Solar (CSG) | 66447_WESTP | Solar | 5.0 MW | operational | Bristol, Massachusetts |
| Woodland Avenue Solar 1 | 65720_5571 | Solar | 5.0 MW | operational | Bristol, Massachusetts |
| Dighton Power Uprate | 398 | Gas | 5.0 MW | operational | Bristol, Massachusetts |
| Adirondack A+B Community Solar Garden | 64588_1 | Solar | 5.0 MW | operational | Bristol, Massachusetts |
| Borrego - Highland Ave | 67279_6572B | Battery | 5.0 MW | active | Bristol, Massachusetts |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Bristol County.