345kV Commodore to Jordan (J2626)

345kV Commodore to Jordan is a 300.0 MW solar interconnection project in Perry, Illinois with a current status of withdrawn. It is proposed to connect at 345kV Commodore to Jordan.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name345kV Commodore to Jordan
Queue IDJ2626
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity300.0 MW
StateIllinois
CountyPerry
Point of interconnection345kV Commodore to Jordan
Requested (queue) date2022-09-15
Proposed in-service date2026-07-31
Operational date2026-07-31
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata