Perry County, Illinois — Interconnection Projects
The interXdata warehouse tracks 30 interconnection projects in Perry, Illinois, representing 3,503 MW of requested capacity.
30Total projects
3Active
21Operational
6Withdrawn
3,503 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 17 | 2,430 MW |
| Battery | 5 | 693 MW |
| Gas | 8 | 380 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Aster to Commodore | J2171 | Solar | 500.0 MW | operational | Perry, Illinois |
| North Coulterville - COMM 345kV | J1712 | Solar | 300.0 MW | operational | Perry, Illinois |
| 345kV Commodore to Jordan | J2626 | Solar | 300.0 MW | withdrawn | Perry, Illinois |
| 7ASTER - 7CMDR 345.0kV | S1095 | Battery | 200.0 MW | operational | Perry, Illinois |
| Commodore-Aster-4513 | J3135 | Solar | 200.0 MW | withdrawn | Perry, Illinois |
| 7CMDR-7ASTER 345 kV | J3060 | Solar | 200.0 MW | withdrawn | Perry, Illinois |
| 7JORD - 7CMDR 345.0kV | S1131 | Battery | 200.0 MW | operational | Perry, Illinois |
| 7JORD - 7CMDR 345.0kV | J3064 | Solar | 157.0 MW | operational | Perry, Illinois |
| J3064 | J3306 | Solar | 150.0 MW | operational | Perry, Illinois |
| Commodore-Jordan | J2306 | Solar | 150.0 MW | withdrawn | Perry, Illinois |
| 7JORD - 7CMDR 345.0kV | J3063 | Battery | 143.0 MW | operational | Perry, Illinois |
| Aster 138kV Substation | J1777 | Solar | 100.0 MW | operational | Perry, Illinois |
| Great Plains Solar, LLC | 69586_GPS | Solar | 100.0 MW | active | Perry, Illinois |
| Aster 138kV Station | S1103 | Battery | 100.0 MW | operational | Perry, Illinois |
| Prairie State Solar Project | 62420_PSS01 | Solar | 99.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_6 | Gas | 50.0 MW | operational | Perry, Illinois |
| St. Johns 138 kV Substation | J3189 | Solar | 50.0 MW | withdrawn | Perry, Illinois |
| Kimmel Road Solar, LLC | 66632_PV | Solar | 50.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_7 | Gas | 50.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_5 | Gas | 50.0 MW | operational | Perry, Illinois |
| Aster 138kV Substation (Rebuild of North Coulterville 138kV) | J1695 | Battery | 50.0 MW | withdrawn | Perry, Illinois |
| Pinckneyville | 55202_8 | Gas | 50.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_3 | Gas | 45.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_2 | Gas | 45.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_4 | Gas | 45.0 MW | operational | Perry, Illinois |
| Pinckneyville | 55202_1 | Gas | 45.0 MW | operational | Perry, Illinois |
| Two Blues Solar, LLC | 70092_2BLUE | Solar | 40.0 MW | active | Perry, Illinois |
| Snapdragon Solar, LLC | 70090_SNPDR | Solar | 28.0 MW | active | Perry, Illinois |
| CVE US IL TAMAROA 316 LLC | 69845_TAMAR | Solar | 3.6 MW | operational | Perry, Illinois |
| NL IL - Kiwi | 69420_KIWI | Solar | 2.0 MW | operational | Perry, Illinois |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.