4LATHAM-4N DEC E 138 kV (J2656)

4LATHAM-4N DEC E 138 kV is a 180.0 MW generation interconnection project in Macon, Illinois with a current status of operational. It is proposed to connect at 4LATHAM-4N DEC E 138 kV.

180.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical name4LATHAM-4N DEC E 138 kV
Queue IDJ2656
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity180.0 MW
StateIllinois
CountyMacon
Point of interconnection4LATHAM-4N DEC E 138 kV
Requested (queue) date2022-09-15
Proposed in-service date2026-05-01
Operational date2026-05-01
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-20phasePhase 2low
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata