71 Charlotte Furnace Rd Hybrid(CSG) (65054_71CPV)

71 Charlotte Furnace Rd Hybrid(CSG) is a 1.0 MW solar interconnection project in Plymouth, Massachusetts with a current status of operational.

1.0 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical name71 Charlotte Furnace Rd Hybrid(CSG)
Queue ID65054_71CPV
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity1.0 MW
StateMassachusetts
CountyPlymouth
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-12-01
Withdrawn date—
Developer—
Utility / transmission owner71CFR WHAM8 Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.