7JORD - 7CMDR 345.0kV is a 200.0 MW battery interconnection project in Perry, Illinois with a current status of operational. It is proposed to connect at 7JORD - 7CMDR 345.0kV.

200.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical name7JORD - 7CMDR 345.0kV
Queue IDS1131
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity200.0 MW
StateIllinois
CountyPerry
Point of interconnection7JORD - 7CMDR 345.0kV
Requested (queue) date2025-11-11
Proposed in-service date2027-12-01
Operational date2027-12-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.