AB Brown 345 - Gibson (Duke Terminal) 345.0kV (J2970)

AB Brown 345 - Gibson (Duke Terminal) 345.0kV is a 250.0 MW solar interconnection project in Posey, Indiana with a current status of withdrawn. It is proposed to connect at AB Brown 345 - Gibson (Duke Terminal) 345.0kV.

250.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAB Brown 345 - Gibson (Duke Terminal) 345.0kV
Queue IDJ2970
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity250.0 MW
StateIndiana
CountyPosey
Point of interconnectionAB Brown 345 - Gibson (Duke Terminal) 345.0kV
Requested (queue) date2022-09-15
Proposed in-service date2026-08-15
Operational date2026-08-15
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.