Posey County, Indiana — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Posey, Indiana, representing 2,836 MW of requested capacity.
16Total projects
1Active
7Operational
8Withdrawn
2,836 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 7 | 1,105 MW |
| Solar | 5 | 936 MW |
| Battery | 4 | 795 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J3424 | Battery | 300.0 MW | withdrawn | Posey, Indiana |
| MISO Queue Project G053 — Gas in Posey, Indiana | G053 | Gas | 260.0 MW | withdrawn | Posey, Indiana |
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J2970 | Solar | 250.0 MW | operational | Posey, Indiana |
| Patoka Solar | 66706_11101 | Solar | 250.0 MW | active | Posey, Indiana |
| AB Brown - Farm Bureau 138.0kV | J3248 | Battery | 250.0 MW | withdrawn | Posey, Indiana |
| A B Brown | 6137_7 | Gas | 235.5 MW | operational | Posey, Indiana |
| A B Brown | 6137_6 | Gas | 235.5 MW | operational | Posey, Indiana |
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J3948 | Battery | 200.0 MW | withdrawn | Posey, Indiana |
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J3414 | Solar | 200.0 MW | withdrawn | Posey, Indiana |
| Posey Solar | 66780_1 | Solar | 190.8 MW | operational | Posey, Indiana |
| SABIC Innovative Plastics Mt. Vernon | 58063_COGN1 | Gas | 108.0 MW | operational | Posey, Indiana |
| MISO Queue Project J332 — Gas in Posey, Indiana | J332 | Gas | 90.0 MW | withdrawn | Posey, Indiana |
| A B Brown | 6137_5 | Gas | 88.2 MW | operational | Posey, Indiana |
| A B Brown | 6137_4 | Gas | 88.2 MW | operational | Posey, Indiana |
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J3492 | Battery | 45.0 MW | withdrawn | Posey, Indiana |
| AB Brown 345 - Gibson (Duke Terminal) 345.0kV | J3491 | Solar | 45.0 MW | withdrawn | Posey, Indiana |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.