AB Brown - Farm Bureau 138.0kV (J3248)

AB Brown - Farm Bureau 138.0kV is a 250.0 MW battery interconnection project in Posey, Indiana with a current status of withdrawn. It is proposed to connect at AB Brown - Farm Bureau 138.0kV.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameAB Brown - Farm Bureau 138.0kV
Queue IDJ3248
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StateIndiana
CountyPosey
Point of interconnectionAB Brown - Farm Bureau 138.0kV
Requested (queue) date2024-04-13
Proposed in-service date2028-09-01
Operational date2028-09-01
Withdrawn date2025-09-30
Developer
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.