Abel Road Bioenergy (65517_BMORC)

Abel Road Bioenergy is a 4.0 MW other interconnection project in Colusa, California with a current status of operational.

4.0 MWCapacity
OperationalStatus
CISOMarket
OtherTechnology

Project facts

Canonical nameAbel Road Bioenergy
Queue ID65517_BMORC
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyOther
Capacity4.0 MW
StateCalifornia
CountyColusa
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2022-07-01
Withdrawn date
Developer
Utility / transmission ownerACC Renewable Resources

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata