Abilene Industrial Park BESS (25INR0702)
Abilene Industrial Park BESS is a 9.9 MW battery interconnection project in Taylor, Texas with a current status of active. It is proposed to connect at Station Name: Abilene Industrial Park TSP Station Code: ABINDUST Load Transformer name: LOAD1 Bus#: 60772 Voltage in kV (Transmission Level): 138kV.
Project facts
| Canonical name | Abilene Industrial Park BESS |
|---|---|
| Queue ID | 25INR0702 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Taylor |
| Point of interconnection | Station Name: Abilene Industrial Park TSP Station Code: ABINDUST Load Transformer name: LOAD1 Bus#: 60772 Voltage in kV (Transmission Level): 138kV |
| Requested (queue) date | 2024-09-12 |
| Proposed in-service date | 2026-01-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Distributed Generation Solutions LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata