Abilene Industrial Park BESS (25INR0702)

Abilene Industrial Park BESS is a 9.9 MW battery interconnection project in Taylor, Texas with a current status of active. It is proposed to connect at Station Name: Abilene Industrial Park TSP Station Code: ABINDUST Load Transformer name: LOAD1 Bus#: 60772 Voltage in kV (Transmission Level): 138kV.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameAbilene Industrial Park BESS
Queue ID25INR0702
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyTaylor
Point of interconnectionStation Name: Abilene Industrial Park TSP Station Code: ABINDUST Load Transformer name: LOAD1 Bus#: 60772 Voltage in kV (Transmission Level): 138kV
Requested (queue) date2024-09-12
Proposed in-service date2026-01-15
Operational date
Withdrawn date
DeveloperDistributed Generation Solutions LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.