Accalia Point Solar (23INR0066)

Accalia Point Solar is a 190.5 MW solar interconnection project in Cameron, Texas with a current status of operational. It is proposed to connect at Tap 345kV 8383 North Edingburg – 79501 Kingfisher.

190.5 MWCapacity
OperationalStatus
CameronMarket
SolarTechnology

Project facts

Canonical nameAccalia Point Solar
Queue ID23INR0066
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCameron
TechnologySolar
Capacity190.5 MW
StateTexas
CountyCameron
Point of interconnectionTap 345kV 8383 North Edingburg – 79501 Kingfisher
Requested (queue) date2020-10-23
Proposed in-service date
Operational date2029-05-31
Withdrawn date
DeveloperAccalia Point Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.