Cameron County, Texas — Interconnection Projects
The interXdata warehouse tracks 150 interconnection projects in Cameron, Texas, representing 10,935 MW of requested capacity.
150Total projects
17Active
125Operational
8Withdrawn
10,935 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 96 | 4,183 MW |
| Solar | 15 | 1,963 MW |
| Battery | 23 | 1,765 MW |
| Gas | 7 | 1,674 MW |
| Wind | 9 | 1,349 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Aegle Power | 27INR0084 | Gas | 1,536.4 MW | operational | Cameron, Texas |
| Pachanga Wind | 22INR0480 | Other | 300.0 MW | operational | Cameron, Texas |
| Hecate Grid East Valley Storage | 66411_RMSY | Battery | 255.0 MW | active | Cameron, Texas |
| Eval Storage | 22INR0401 | Other | 251.8 MW | operational | Cameron, Texas |
| Diaz BESS | 25INR0386 | Battery | 241.5 MW | active | Cameron, Texas |
| Puerto Del Sol 2 | 27INR0002 | Solar | 213.8 MW | operational | Cameron, Texas |
| Puerto Del Sol 1 | 26INR0008 | Solar | 213.8 MW | operational | Cameron, Texas |
| Cottage Meadow Storage | 21INR0488 | Other | 209.0 MW | withdrawn | Cameron, Texas |
| Pajarita BESS | 22INR0466 | Battery | 205.5 MW | active | Cameron, Texas |
| Alexandrite Storage | 24INR0381 | Other | 203.0 MW | operational | Cameron, Texas |
| Los Vientos Wind 1B | 57752_1 | Wind | 201.6 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 4 | 28INR0427 | Other | 201.1 MW | operational | Cameron, Texas |
| Oorja Storage | 25INR0250 | Other | 201.1 MW | withdrawn | Cameron, Texas |
| Ouroboros Grid BESS 5 | 28INR0428 | Other | 201.0 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 6 | 28INR0429 | Other | 200.9 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 1 | 28INR0397 | Other | 200.8 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 2 | 28INR0398 | Other | 200.8 MW | operational | Cameron, Texas |
| Rio Hondo BESS | 26INR0461 | Other | 200.8 MW | operational | Cameron, Texas |
| Bobcat Cameron BESS | 25INR0385 | Other | 200.8 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 3 | 28INR0403 | Other | 200.7 MW | operational | Cameron, Texas |
| Resaca Oasis Storage | 69120_RESBS | Battery | 200.7 MW | active | Cameron, Texas |
| Resaca Oasis Storage | 27INR0399 | Other | 200.7 MW | operational | Cameron, Texas |
| Los Vientos Wind 1A | 57751_1 | Wind | 200.0 MW | operational | Cameron, Texas |
| La Chalupa, LLC | 63624_LC | Wind | 198.5 MW | operational | Cameron, Texas |
| Accalia Point Solar | 23INR0066 | Solar | 190.5 MW | operational | Cameron, Texas |
| Accalia Point Solar, LLC | 66673_66666 | Solar | 190.5 MW | active | Cameron, Texas |
| Harryoung Solar | 25INR0270 | Solar | 190.0 MW | operational | Cameron, Texas |
| HarryoungBESS | 25INR0552 | Other | 190.0 MW | operational | Cameron, Texas |
| Harryoung PV and BESS | 67777_GRS4B | Battery | 190.0 MW | active | Cameron, Texas |
| Harryoung PV and BESS | 67777_GRS4P | Solar | 190.0 MW | active | Cameron, Texas |
| Arroyo Storage | 24INR0306 | Other | 183.8 MW | operational | Cameron, Texas |
| Arroyo Storage | 69151_ARY_B | Battery | 180.0 MW | active | Cameron, Texas |
| Amberjack2 BESS | 26INR0640 | Other | 180.0 MW | operational | Cameron, Texas |
| Chalupa Wind | 20INR0042 | Wind | 174.0 MW | operational | Cameron, Texas |
| Cameron Wind 1 LLC | 59118_CAM1 | Wind | 165.0 MW | operational | Cameron, Texas |
| Grand Acres | 23INR0374 | Solar | 153.0 MW | withdrawn | Cameron, Texas |
| Palmas Wind, LLC | 61773_PW | Wind | 144.9 MW | operational | Cameron, Texas |
| Palmas Altas Wind | 17INR0037 | Wind | 144.9 MW | operational | Cameron, Texas |
| Nebula Solar | 19INR0045 | Solar | 137.4 MW | operational | Cameron, Texas |
| Nebula Solar | 65661_NEB1 | Solar | 135.0 MW | operational | Cameron, Texas |
| Palacios BESS | 25INR0418 | Battery | 125.7 MW | withdrawn | Cameron, Texas |
| Marengo BESS | 25INR0419 | Battery | 120.7 MW | active | Cameron, Texas |
| Megacharge BESS | 24INR0572 | Other | 110.0 MW | operational | Cameron, Texas |
| Citrus Flatts BESS | 24INR0294 | Other | 103.0 MW | operational | Cameron, Texas |
| Solar Star Frontier BESS | 26INR0181 | Other | 101.0 MW | operational | Cameron, Texas |
| Citrus Flatts Energy Center, LLC | 69352_CFBA1 | Battery | 100.0 MW | operational | Cameron, Texas |
| Arroyo Solar | 20INR0086 | Solar | 100.0 MW | operational | Cameron, Texas |
| San Roman Wind I, LLC | 59712_SRWI | Wind | 95.3 MW | operational | Cameron, Texas |
| Harper Energy Storage | 22INR0469 | Other | 82.4 MW | operational | Cameron, Texas |
| Rio Grand Valley Element Fuels Power | 26INR0515 | Other | 79.6 MW | operational | Cameron, Texas |
| Silas Ray | 3559_10 | Gas | 61.0 MW | operational | Cameron, Texas |
| La Feria Irrigation District 1 Solar | 27INR0036 | Solar | 54.4 MW | withdrawn | Cameron, Texas |
| Harlingen Irrigation District 1 Solar | 27INR0037 | Solar | 54.3 MW | withdrawn | Cameron, Texas |
| Silas Ray | 3559_9 | Gas | 50.0 MW | operational | Cameron, Texas |
| Boca Chica Solar | 23INR0016 | Solar | 50.0 MW | withdrawn | Cameron, Texas |
| Vancourt Solar | 21INR0213 | Solar | 45.7 MW | operational | Cameron, Texas |
| Vancourt Solar Interconnections | 65662_VAN1 | Solar | 45.0 MW | operational | Cameron, Texas |
| Arroyo Storage (Placeholder) | 24INR0643 | Other | 35.2 MW | withdrawn | Cameron, Texas |
| Espiritu Wind | 17INR0031 | Wind | 25.2 MW | operational | Cameron, Texas |
| Burro Loco Energy Storage | 24INR0319 | Other | 25.1 MW | operational | Cameron, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Ouroboros Grid BESS Unit 6 | 6 | 1,205 MW |
| BT Cantwell Solar, LLC | 3 | 319 MW |
| VESI 37 LLC | 3 | 313 MW |
| Acciona | 3 | 344 MW |
| BRP Blue Topaz 2, LLC | 3 | 488 MW |
| Aggreko MSR Grid PC5 | 2 | 20 MW |
| PUERTO DEL SOL, LLC | 2 | 428 MW |
| Rayos Del Sol Solar Project, LLC | 2 | 183 MW |
| Gransolar Texas Four LLC | 2 | 380 MW |
| Johnson Energy Storage, LLC | 1 | 203 MW |
| Element H2Gen, LLC | 1 | 80 MW |
| Aegle Power LLC | 1 | 1,536 MW |
| SBESS TX25 LLC | 1 | 201 MW |
| Hecate Grid East Valley Storage LLC | 1 | 252 MW |
| La Patrona Floating Solar LLC | 1 | 54 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Cameron County.
Start tracking with interXdata