Accalia Point Solar, LLC (66673_66666)

Accalia Point Solar, LLC is a 190.5 MW solar interconnection project in Cameron, Texas with a current status of active.

190.5 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameAccalia Point Solar, LLC
Queue ID66673_66666
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologySolar
Capacity190.5 MW
StateTexas
CountyCameron
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-05-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAccalia Point Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.