Acker BESS (25INR0460)

Acker BESS is a 301.0 MW other interconnection project in Castro, Texas with a current status of operational. It is proposed to connect at 23912 Ogallala 345 kV.

301.0 MWCapacity
OperationalStatus
CastroMarket
OtherTechnology

Project facts

Canonical nameAcker BESS
Queue ID25INR0460
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCastro
TechnologyOther
Capacity301.0 MW
StateTexas
CountyCastro
Point of interconnection23912 Ogallala 345 kV
Requested (queue) date2023-06-07
Proposed in-service date
Operational date2028-04-17
Withdrawn date
DeveloperOgallala BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata