Acushnet Ball Plant 2 (62835_ESS-1)

Acushnet Ball Plant 2 is a 1.0 MW battery interconnection project in Bristol, Massachusetts with a current status of operational.

1.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameAcushnet Ball Plant 2
Queue ID62835_ESS-1
Statusoperational
Source status(OA) Out of service but expected to return to service in next calendar year
MarketISNE
TechnologyBattery
Capacity1.0 MW
StateMassachusetts
CountyBristol
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-06-01
Withdrawn date—
Developer—
Utility / transmission ownerAcushnet

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata