Adams Brook Storage (26INR0392)

Adams Brook Storage is a 313.5 MW other interconnection project in Wilbarger, Texas with a current status of withdrawn. It is proposed to connect at The Krum West Switch (#1730) to Riley (#6111) Line ckt# 2 ;ONCOR.

313.5 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameAdams Brook Storage
Queue ID26INR0392
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity313.5 MW
StateTexas
CountyWilbarger
Point of interconnectionThe Krum West Switch (#1730) to Riley (#6111) Line ckt# 2 ;ONCOR
Requested (queue) date2024-02-06
Proposed in-service date2027-09-30
Operational date
Withdrawn date2024-04-24
DeveloperAdams Creek Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata