AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV (J3271)

AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV is a 230.0 MW solar interconnection project in Mississippi, Arkansas with a current status of withdrawn. It is proposed to connect at AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV.

230.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV
Queue IDJ3271
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity230.0 MW
StateArkansas
CountyMississippi
Point of interconnectionAECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV
Requested (queue) date2024-04-17
Proposed in-service date2028-09-04
Operational date2028-09-04
Withdrawn date2025-09-03
Developer
Utility / transmission ownerARKANSAS ELECTRIC COOPERATIVE CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata