ARKANSAS ELECTRIC COOPERATIVE CORPORATION — Interconnection Queue Projects

ARKANSAS ELECTRIC COOPERATIVE CORPORATION is associated with 15 tracked interconnection projects representing 2,110 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

15Projects
0Active
4Operational
11Withdrawn
2,110 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar101,490 MW
Battery4440 MW
Wind1180 MW

Portfolio by market

MarketProjects
MISO1

Geographic footprint

StateProjects
Arkansas14
Alaska1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVJ3580Battery250.0 MWwithdrawnMississippi, Arkansas
Dell to Nucor 161 kVJ2294Solar250.0 MWoperationalMississippi, Arkansas
AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVJ3271Solar230.0 MWwithdrawnMississippi, Arkansas
Gainesville Switching StationJ2298Solar200.0 MWoperationalGreene, Arkansas
AECC Dry Creek 161kV Switchyard StationJ1437Wind180.0 MWoperationalCarroll County, Arkansas
MISO Queue Project J3263 — Solar in Desha, ArkansasJ3263Solar150.0 MWwithdrawnDesha, Arkansas
BaileyJ3253Solar150.0 MWwithdrawnWoodruff, Arkansas
DUMAS - REED SS 115.0kVJ3263Solar150.0 MWwithdrawnDesha, Alaska
Blytheville NorthJ3376Solar130.0 MWwithdrawnMississippi, Arkansas
McClellan 138 kV SubstationJ3164Battery100.0 MWwithdrawnOuachita, Arkansas
Gainesville Switching StationJ3578Solar100.0 MWwithdrawnGreene, Arkansas
AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVJ2871Solar70.0 MWoperationalMississippi, Arkansas
LunsfordJ3599Solar60.0 MWwithdrawnCraighead, Arkansas
Gainesville Switching StationJ2300Battery50.0 MWwithdrawnGreene, Arkansas
Deluce 115kVJ2994Battery40.0 MWwithdrawnArkansas, Arkansas

Recent material changes

ObservedProjectFieldOldNew
2026-10-31Deluce 115kVphasePhase 2Phase 3
2026-10-31AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVphasePhase 2Phase 3
2026-10-31McClellan 138 kV SubstationphasePhase 2Phase 3
2026-10-14Deluce 115kVphasePhase 1Phase 2
2026-10-14AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kVphasePhase 1Phase 2
2026-10-14McClellan 138 kV SubstationphasePhase 1Phase 2

Explore related data

Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through ARKANSAS ELECTRIC COOPERATIVE CORPORATION.

Start tracking with interXdata