ARKANSAS ELECTRIC COOPERATIVE CORPORATION — Interconnection Queue Projects
ARKANSAS ELECTRIC COOPERATIVE CORPORATION is associated with 14 tracked interconnection projects representing 2,040 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 9 | 1,420 MW |
| Battery | 4 | 440 MW |
| Wind | 1 | 180 MW |
Portfolio by market
| Market | Projects |
|---|---|
| MISO | 1 |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV | J3580 | Battery | 250.0 MW | withdrawn | Mississippi, Arkansas |
| Dell to Nucor 161 kV | J2294 | Solar | 250.0 MW | operational | Mississippi, Arkansas |
| AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV | J3271 | Solar | 230.0 MW | withdrawn | Mississippi, Arkansas |
| Gainesville Switching Station | J2298 | Solar | 200.0 MW | operational | Greene, Arkansas |
| AECC Dry Creek 161kV Switchyard Station | J1437 | Wind | 180.0 MW | operational | Carroll County, Arkansas |
| Bailey | J3253 | Solar | 150.0 MW | withdrawn | Woodruff, Arkansas |
| DUMAS - REED SS 115.0kV | J3263 | Solar | 150.0 MW | withdrawn | Desha, Alaska |
| MISO Queue Project J3263 — Solar in Desha, Arkansas | J3263 | Solar | 150.0 MW | withdrawn | Desha, Arkansas |
| Blytheville North | J3376 | Solar | 130.0 MW | withdrawn | Mississippi, Arkansas |
| Gainesville Switching Station | J3578 | Solar | 100.0 MW | withdrawn | Greene, Arkansas |
| McClellan 138 kV Substation | J3164 | Battery | 100.0 MW | withdrawn | Ouachita, Arkansas |
| Lunsford | J3599 | Solar | 60.0 MW | withdrawn | Craighead, Arkansas |
| Gainesville Switching Station | J2300 | Battery | 50.0 MW | withdrawn | Greene, Arkansas |
| Deluce 115kV | J2994 | Battery | 40.0 MW | withdrawn | Arkansas, Arkansas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through ARKANSAS ELECTRIC COOPERATIVE CORPORATION.
Start tracking with interXdata