AECC Dry Creek 161kV Switchyard Station (J1437)

AECC Dry Creek 161kV Switchyard Station is a 180.0 MW wind interconnection project in Carroll County, Arkansas with a current status of operational. It is proposed to connect at AECC Dry Creek 161kV Switchyard Station.

180.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameAECC Dry Creek 161kV Switchyard Station
Queue IDJ1437
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity180.0 MW
StateArkansas
CountyCarroll County
Point of interconnectionAECC Dry Creek 161kV Switchyard Station
Requested (queue) date2019-04-29
Proposed in-service date2021-04-30
Operational date2021-04-30
Withdrawn date
Developer
Utility / transmission ownerARKANSAS ELECTRIC COOPERATIVE CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata