AECC Hermitage south- Hilo 115Kv (J2977)

AECC Hermitage south- Hilo 115Kv is a 150.0 MW solar interconnection project in Bradley, Arkansas with a current status of withdrawn. It is proposed to connect at AECC Hermitage south- Hilo 115Kv.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAECC Hermitage south- Hilo 115Kv
Queue IDJ2977
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateArkansas
CountyBradley
Point of interconnectionAECC Hermitage south- Hilo 115Kv
Requested (queue) date2022-09-13
Proposed in-service date2027-08-31
Operational date2027-08-31
Withdrawn date2023-03-24
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.